Copper pipe
Project Execution gallery
>OML99: “AMP1 CONNECTION OF TEST SEPARATOR TO ATMOSPHERIC SEPARATOR (ADDENDUM ESD LOGIC) – Shutdown Project (Completed during the OML99 ffsd 2014)
OML99, AMD1 NEW WHCP INSTALLATION AND HOOK UP OF VENT, DRAIN & INSTRUMENT AIR LINE (Completed during the OML99 ffsd 2014)
Cable
Galvanized Pipe
Tank Maintenance (Blasting and Painting)
Flanges
Welding and Fabrication work
© 2017 Bojmet Oil & Gas. All rights reserved. | Login